Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

May 15, 2023     Avionics and Electrical - (7.8 hours) Category: Avionics
Created a pivot table on the spreadsheet and merged my wire inventory data with the wire needed. Noticed where some of the pivot table data didn't make sense so went through several iterations of corrections. Noticed I hadn't been consistent with wire color for power and switched power. Made final decisions on wire colors and updated the spreadsheet. Noticed and corrected some wire name inconsistencies. Decided on three sources for wire depending on availability and price. Started reviewing the existing cart for Stein Air and Aircraft Spruce and deleted or saved items not needed and added lines for all the wire.

Reviewed wire order list a final time and made decisions of how much extra to buy of each wire type.

Looked at splice and solder sleeve counts on the spreadsheet and determined I need to buy at least 30 blue splices and 6 sleeves for shield cable with 1 conductor, 33 sleeves for 2 conductor and 33 sleeves for 3 conductor. Started looking for sources.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.